Pre-Production Test Report for Separation Fitting, 'E' Series, First Stage, Dwg. Nos. 27-45402, 27-72231.

Abstract

The purpose of the report is to describe the test equipment and procedure required for the pre-production testing of the 'E' series first stage separation fitting. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 14, 1961
Accession Number
AD0843176

Entities

People

  • F. L. Costa

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Test Equipment

Readers

  • Aerospace Test and Evaluation