Tanking Test of 'E' Silo Boil-Off Valve DWG. No. 27-80750/27-81448,
Abstract
The object of the test was to determine the stability of the boil-off valve during tanking tests when being controlled by sensor controllers and by the solenoid controller. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 17, 1961
- Accession Number
- AD0843349
Entities
People
- D. J. Melvin
Organizations
- General Dynamics