Pre-Production Test Report on Hose Assembly-Metallic, Missileborne, DWG. No. 27-08521,

Abstract

The data presented in the report are the results of pre-production testing of a hose assembly-metallic, missileborne. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jul 07, 1961
Accession Number
AD0843360

Entities

People

  • B. Augustus

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Assembly
  • Manufacturing
  • Mass Production
  • Production

Fields of Study

  • Physics