3 AND 4E Hydraulic Staging Line Investigation,
Abstract
The objective of the test was to conduct additional testing of the 3E and 4E configuration of staging disconnects and associated hydraulic lines, under simulated flight loads, to verify the hydraulic installation. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 31, 1961
- Accession Number
- AD0843412
Entities
People
- S. R. Harrison
Organizations
- General Dynamics