Evaluation Test Report for Circle Seal High Pressure Shuttle Valve P9-425 and Check-out Coupler P10-425,

Abstract

The object of the test was to determine the structural integrity, internal helium gas and/or hydraulic fluid leakage and line pressure loss during normal operation of the shuttle valve and checkout coupler. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 04, 1961
Accession Number
AD0843413

Entities

People

  • C. C. Crush

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Fluids
  • Gases
  • High Pressure
  • Hydraulic Fluids
  • Structural Integrity

Readers

  • Aerospace Test and Evaluation
  • Combustion and Flow Dynamics.
  • Microwave Engineering.