Pre-production Test Report for Header Assembly-Tank Door, Liquid Oxygen DWG. No. 27-04241,
Abstract
The purpose of the report is to describe the test equipment and procedure required for the pre-production testing of two header assemblies - tank door, liquid oxygen. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 03, 1960
- Accession Number
- AD0844023
Entities
People
- J. W. Routson
- W. Gregg
Organizations
- General Dynamics