Pre-production Test Report for Header Assembly-Tank Door, Liquid Oxygen DWG. No. 27-04241,

Abstract

The purpose of the report is to describe the test equipment and procedure required for the pre-production testing of two header assemblies - tank door, liquid oxygen. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 03, 1960
Accession Number
AD0844023

Entities

People

  • J. W. Routson
  • W. Gregg

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Assembly
  • Assembly Lines
  • Liquid Oxygen
  • Manufacturing
  • Mass Production
  • Production
  • Test Equipment

Readers

  • Materials Science
  • Software Engineering