WS 107A-1 Silo Launch Complex. Installation and Tolerance Requirement Report Silo-Missile Lifting System,

Abstract

To determine the requirements for the installation of AGE and its relation facility items, a philosophy has been developed which establishes a basic reference system. The present tolerances and locating dimensions of critical items have been evaluated with respect to this basic reference system and changes recommended where necessary or desirable. In addition, requirements for positioning the Crib by the use of horizontal shoring during the I and C phase have been defined. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 31, 1961
Accession Number
AD0844778

Entities

People

  • K. L. Lawrence

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Buildings And Structures
  • Philosophy

Readers

  • Aerospace Test and Evaluation
  • Logistics and Supply Chain Management.