WS 107A-1 Silo Launch Complex. Installation and Tolerance Requirement Report Silo-Missile Lifting System,
Abstract
To determine the requirements for the installation of AGE and its relation facility items, a philosophy has been developed which establishes a basic reference system. The present tolerances and locating dimensions of critical items have been evaluated with respect to this basic reference system and changes recommended where necessary or desirable. In addition, requirements for positioning the Crib by the use of horizontal shoring during the I and C phase have been defined. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 31, 1961
- Accession Number
- AD0844778
Entities
People
- K. L. Lawrence
Organizations
- General Dynamics