Pre-Production Test Report for 2/C Number 16 AWG Cable Assembly GD/A Part No. 27-09094-801,
Abstract
The purpose of the pre-production tests were to qualify the cable assembly as an electrical interconnecting point between chassis, junction boxes, and/or assemblies of the silo crib equipment. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 13, 1961
- Accession Number
- AD0847332
Entities
People
- David Evans
Organizations
- General Dynamics