Evaluation Test Report for Disconnect - Centaur Staging, Modifications Drawing No. 55-61038 SK-61461,
Abstract
The objective of the test was to verify that the design of the Centaur staging disconnect was compatible with the intended installation, that it was moisture sealing, and that effective disconnect could be made at less than 5 pounds applied separation force both at room temperature and at liquid oxygen temperature. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 31, 1962
- Accession Number
- AD0847365
Entities
People
- M. J. Willey
Organizations
- General Dynamics