A Hand Tool Selection Procedure for Navy Construction Battalions.
Abstract
A methodology is developed whereby the most cost-effective hand tools commercially available can be identified, evaluated, and incorporated in the authorized hand tool allowance. Several tools are evaluated via the methodology illustrated. Essential future program efforts necessary for the optimization of tool allowance are identified. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1969
- Accession Number
- AD0850903
Entities
People
- B. C. Whitherspoon
Organizations
- Naval Facilities Engineering Service Center