A Hand Tool Selection Procedure for Navy Construction Battalions.

Abstract

A methodology is developed whereby the most cost-effective hand tools commercially available can be identified, evaluated, and incorporated in the authorized hand tool allowance. Several tools are evaluated via the methodology illustrated. Essential future program efforts necessary for the optimization of tool allowance are identified. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1969
Accession Number
AD0850903

Entities

People

  • B. C. Whitherspoon

Organizations

  • Naval Facilities Engineering Service Center

Tags

DTIC Thesaurus Topics

  • Construction

Readers

  • Instructional Design and Training Evaluation.
  • Military Mobilization and Reserve Forces Studies.
  • Software Engineering.