Initial Production Test of Compressor, Reciprocating, 4-CFM, 3000-PSI.
Abstract
This report summarizes the initial production test of the 4-cfm, 3000-psig reciprocating compressor. The purpose of the test was to determine conformance of the compressor to required performance characteristics. The results showed that most equipment failures were encountered during low-temperature operation and during 1000 hours of endurance testing. The most critical failures were those of the timer, rubber angle-drive coupling, and manual reservoir bypass valve, and replacement of the dehydrator filter cartridge. It is concluded that the compressor meets the test objectives with the exceptions noted.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1969
- Accession Number
- AD0851047
Entities
People
- Victor W. Morawski Jr.