Special Missile Lift System Tests at OSTF-2, Category I.
Abstract
The missile lift system special tests conducted during the period of 14 August to 20 December 1961 were conducted to check out the operation of the system under a variety of load conditions. A total of thirty-nine cycles of the lift system was completed. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1961
- Accession Number
- AD0851207
Entities
Organizations
- General Dynamics