Factory Acceptance Testing of Missile 124D. Amendment A.
Abstract
Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Electrical system; Flight control system; Guidance system; Instrumentation range safety system; Propellant utilization system; and Propulsion system. (Author)