Factory Acceptance Testing of Missile 142D.
Abstract
Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Electrical system; Flight control system; Guidance system; Propellant utilization system; and Propulsion system. (Author)