Test Lab Wind Tunnel Test Report on Ground Wind Loads. Addendum B.
Abstract
The primary additional objectives of this phase of testing were to: Verify the adequacy of the Mast 3A fix as actually constructed on the full-scale mast; Obtain correlation data for full-scale wind studies; and Obtain test results on a new payload model used with the Atlas-Agena combination. Investigation of the effects of a spring-mass propellant slosh simulator was a secondary objective. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 28, 1963
- Accession Number
- AD0852836
Entities
People
- K. F. Koehl
Organizations
- General Dynamics