Test Lab Wind Tunnel Test Report on Ground Wind Loads. Addendum A.
Abstract
The objective of this phase of testing was to investigate various proposed fixes for the mast. All fixes were individually attached to the mast except one which was mounted upstream of the mast and model to simulate turbulences produced by the missile service tower. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 31, 1962
- Accession Number
- AD0852837
Entities
People
- K. F. Koehl
Organizations
- General Dynamics