Project Mallard Systems Study. Cost-Effectiveness Models and Subsystems. Volume IV. Section 4.7 and 4.8.

Abstract

This is the fourth Volume of the six-Volume report. It contains paragraphs 4.7 and 4.8 of Section 4, 'System and Subsystems Analyses and Trade-offs.' The paragraphs are entitled, 'Multiplex,' and 'Switching,' respectively. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jul 20, 1968
Accession Number
AD0854266

Entities

People

  • Max Goldman

Tags

DTIC Thesaurus Topics

  • Cost Effectiveness
  • Costs

Readers

  • Aerospace Test and Evaluation
  • Business Analytics
  • Life Cycle Cost Analysis