An Analysis of the Huggins TWT Power Supply.
Abstract
The analysis was divided into three parts: component stresses; power supply performance; and component adequacy. The report presents the description and results of this analysis. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1968
- Accession Number
- AD0856335
Entities
Organizations
- Naval Air Weapons Station China Lake