Functional Tests on Two Gemini B Coolant Pump Assemblies.

Abstract

Two Coolant Pump Assemblies were tested functionally by the Failure Analysis Laboratory in accordance with specifications. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 17, 1967
Accession Number
AD0856574

Entities

People

  • Craig A. Meier

Tags

DTIC Thesaurus Topics

  • Assembly
  • Coolant Pumps
  • Failure Analysis
  • Pumps
  • Specifications