Gemini B Oxygen Safety Study. Volume VI. Procedures - Ground Testing and Flight.

Abstract

The procedures to be used in Gemini B in-plant testing and operations, ground checkout and pre-launch testing and operations are discussed relative to safe operations with respect to fire. The procedures examined consist of those associated with the Environmental Control System (ECS), the Reentry Control System (RCS), and the Pyrotechnic System since these systems present the greatest hazard with respect to fire. The primary area of consideration is inside the pressure cabin, with hatches closed and a 100% oxygen atmosphere. Therefore, principal concern is focused on ECS cabin procedures during in-plant, ground checkout and pre-launch operations. Flight operations are discussed in Volume VIII (AD-856 664). The procedures reviewed are nonelectrical, since the electrical components do not impose critical or special procedures with respect to fire safety. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 15, 1967
Accession Number
AD0856662

Tags

DTIC Thesaurus Topics

  • Control Systems
  • Fire Safety
  • Safety

Readers

  • Aerospace Test and Evaluation
  • Fire Suppression Systems Design.