Gemini B Mass Properties Report 3.3 Operational Support Plan for Remote Site Phase.
Abstract
The report presents the procedures for determining and recording the mass property revisions resulting from spacecraft changes implemented at the remote site. The channels through which the data is to proceed for rapid evaluation and incorporation are outlined. The procedure which allows for the contingency requirement to retarget the retrograde rockets is presented along with the procedure for the single point check weighing. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 08, 1968
- Accession Number
- AD0856816