Gemini B Mass Properties Report 3.3 Operational Support Plan for Remote Site Phase.

Abstract

The report presents the procedures for determining and recording the mass property revisions resulting from spacecraft changes implemented at the remote site. The channels through which the data is to proceed for rapid evaluation and incorporation are outlined. The procedure which allows for the contingency requirement to retarget the retrograde rockets is presented along with the procedure for the single point check weighing. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 08, 1968
Accession Number
AD0856816

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Space Systems
  • Spacecraft
  • Test And Evaluation

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Archaeological Resource Survey
  • Control Systems Engineering.

Technology Areas

  • Space
  • Space - Space Objects