Verification Test Plan for Environmental Control Unit CEI 109A. Data Item No. UT-454,
Abstract
Testing was conducted during design and fabrication of first environmental control unit for design feasibility, verification, and design optimization purposes. These tests will help to determine the most effective method for flow, temperature, and humidity control, as well as the preliminary tests necessary for adjustment and calibration of the overall system. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 17, 1969
- Accession Number
- AD0859127
Entities
People
- H. P. Fleckenstein
Organizations
- General Electric