Project MALLARD. Engineering Services and Operational Support.

Abstract

Contents: Final Report of Progress--U.S. planning documents, Management information system, Work breakdown structure, Cost and system effectiveness methodology, Configuration management, JEA support, International system specification, Third party consulting services; Program Status Highlights--Background, Cost and schedule performance, Management by exception, Maintaining completion in system studies, Transition planning for Phase 2A, U.S. procedures, Configuration management, Quick reaction capability, Project control room.

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1969
Accession Number
AD0861292

Entities

People

  • Darrall J. Freund
  • James C. Moseley
  • James W. Huber
  • William F. Cox

Tags

DTIC Thesaurus Topics

  • Configuration Management
  • Engineering
  • Information Systems
  • Interdisciplinary Science
  • Management Information Systems
  • Specifications
  • Transitions

Readers

  • Aerospace Test and Evaluation
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Life Cycle Cost Analysis