Minor Access Switch TD 201.
Abstract
During this period work has been particularly concerned with the following major items each of which is dealt with in detail; Analysis of Specification including Facilities Control; Determination of Logic Family and Rules; Updating the Design Plan; Finalisation of COMSEC PLAN; and Test methods for Equipment Units.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1970
- Accession Number
- AD0865265