Land Combat Support System.

Abstract

This Second Quarterly Interim Technical Report presents the Phase IIIA technical progress made on the Land Combat Support System (LCSS) during the period 18 July through 30 September 1969. The overall effort consisted of three major tasks; update and refurbishment of the AN/TSM-93 test stations, program development for Weapon System and LCSS test set UUT's, and test station improvements. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 30, 1969
Accession Number
AD0865343

Tags

DTIC Thesaurus Topics

  • Combat Support
  • Land Warfare
  • Test Sets
  • Warfare
  • Weapon Systems
  • Weapons

Fields of Study

  • Engineering

Readers

  • Joint Military Operations and Doctrine.
  • Software Engineering
  • Technical Research and Report Writing.