Initial Production Test of Load Bank, 0 to 30 kw, Alternating-Current, Portable, Skid-Mounted.

Abstract

The initial production test of the load bank, 0 to 30 kw, a-c was conducted at Aberdeen Proving Ground from October 1969 to January 1970 to determine if the test units would withstand environmental, transportation, durability, and operational tests in accordance with requirements outlined in MIL-L-52366A(ME) 14 April 1967 (Reference 1).

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1970
Accession Number
AD0866699

Entities

People

  • John Ferrara

Tags

DTIC Thesaurus Topics

  • Alternating Current
  • Electric Current
  • Production
  • Resilience
  • Test And Evaluation
  • Transportation

Readers

  • Aerospace Test and Evaluation
  • Thin Film Deposition Science.