Executive Decision Survey. Annex A to Volume VIII, Phase IIB Development Plan for the Integrated Facilities System.
Abstract
An executive level survey was conducted to identify facility information needs so that they could be incorporated into the integrated facilities system (IFS) design. The report summarizes the analysis to date. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1970
- Accession Number
- AD0870198
Entities
People
- F. Gordon Barry
- Joseph F. Selement
- Kenneth R. Pope
- Raymond L. Latimer
- Robert M. Briden