Initial Production Test (Retest) of Air Conditioner, 36,000 BTU/HR, 60-HZ, Single Package.

Abstract

This report summarizes the initial production test (retest) of the 36,000 Btu per hour, single-package air conditioner conducted at Aberdeen Proving Ground from 24 November 1969 to 3 February 1970. The purpose of the test was to determine whether units modified to prevent the humidity and vibration failures reported in a previous test are suitable for release.

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1970
Accession Number
AD0870524

Entities

People

  • Ralph W. Emmons

Tags

DTIC Thesaurus Topics

  • Biological Phenomena
  • Ecological And Environmental Phenomena
  • Ecological And Environmental Processes
  • Humidity
  • Mechanical Waves
  • Meteorological Phenomena
  • Motion
  • Production
  • Vibration

Readers

  • Electrical Engineering
  • Software Engineering