Initial Production Test of Compressor, 600-CFM.

Abstract

This report summarizes the initial production test of the 600-cfm compressor conducted at Aberdeen Proving Ground from 3 March 1969 to 6 April 1970. The purpose of the test was to determine conformance of the compressor to required performance characteristics.

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1970
Accession Number
AD0871054

Entities

People

  • Victor W. Morawski Jr.

Tags

DTIC Thesaurus Topics

  • Compressors

Fields of Study

  • Engineering

Readers

  • Aerodynamics.
  • Instructional Design and Training Evaluation.
  • Military/Explosive Ordnance Disposal (EOD) Technology