Operational Testing of Causeway Connection Systems for the 20-knot LST.
Abstract
The introduction of the new 20-knot (Class 1170) LST into the fleet required the development of a causeway connection system for off-loading cargo over the bow ramp. Two connection systems, the abutment connection and the stand-off connection, were developed. Operational tests of the connection systems are described. To aid the ship in positioning its bow, a modified abutment fender with sides sloping toward the central notch was constructed and tested. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1970
- Accession Number
- AD0874594
Entities
People
- Billie R. Karrh
Organizations
- Naval Facilities Engineering Service Center