Compressor Research Facility Rig 4 Project Analysis Report. Volume 2. Test and Operating Philosophy
Abstract
Purpose of the compressor research facility; CRF capabilities; Modes of operation; Overall operating philosophy; Control console layout; CRF personnel requirements; Test planning and documentation; Off-line calibration and maintenance philosophy; Facility controls; Computer and measurement system operating philosophy; Pretest requirements; Torquemeter calibration and operating philosophy; Drive system gearing; Facility startup; Communications systems; Single spool fan and compressor testing; and Dual spool compressor testing.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 19, 1970
- Accession Number
- AD0875755
Entities
Organizations
- General Electric