Design, Development, and Fabrication of FMU-63/B Bomb Fuze
Abstract
All phases of a complete development program for this fuze were carried out with a goal of developing a safe and reliable long delay fuze that is compatible with available subsonic and supersonic delivery systems. The final result of this development program was a long delay (1.0 hour to 199 hour) bomb fuze compatible with retarded or nonretarded bomb systems in either nose or tail fuze well installations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1971
- Accession Number
- AD0900941
Entities
People
- Robert W. Shirley
Organizations
- Honeywell International, Inc.