Reliability Test Plan and Procedures for C-4453/APQ-100 and C-6410/APQ-109 Radar Indicator Control Units

Abstract

This document presents the requirements, definitions, and methods necessary to demonstrate the reliability of the C-4453/APQ-100 and C-6410/APQ-109 Radar Indicator Control Units (ICUs). This test is in support of the Rivet Haste II program and an essential part of the F-4 fire control system Increase Reliability of Operational Systems (IROS) program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1972
Accession Number
AD0903500

Entities

People

  • Kenneth M. Hentges

Organizations

  • Ogden Air Logistics Complex

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Control Systems
  • Engineering
  • Failure Analysis
  • Fire Control Systems
  • High Temperature
  • Indicators
  • Maintainability
  • Materials
  • Plastic Explosives
  • Reliability
  • Reliability Engineering
  • Systems Engineering
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Vibration

Fields of Study

  • Engineering

Readers

  • Aerospace Test and Evaluation
  • Atmospheric Science/Meteorology