MK82 BALLUTE Retarder System Structural Qualifications
Abstract
When the Mk82 ballute retarder system was received from the contractor to be qualified for flight testing, certain areas of analyses usually required had been omitted from the data package. This report details the completed in-house design work and the ground testing necessary to verify the analyses and to qualify the retarder system.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1973
- Accession Number
- AD0911292
Entities
People
- Wiley J. Robinson