Check Test of Mast AB-577/GRC under Arctic Winter Conditions.

Abstract

A check test of the Mast AB-577 was conducted by the Arctic Test Center under arctic winter conditions at Fort Greely, AK, from 30 Oct 73 to 21 Mar 74. Functional testing was conducted in temperatures ranging from -5 F to -54 F. Preoperational inspection, personnel training, functional adequacy, maintenance evaluation, safety, human factors engineering, and value engineering subtests were conducted. The purpose of the test was to determine if previously reported deficiencies and shortcomings had been corrected and to insure no new deficiencies has been introduced by the modifications. It was concluded that the Mast AF-577 functioned as required down to -54 F and that the deficiencies and shortcoming had been eliminated. (Author)

Document Details

Document Type
Technical Report
Publication Date
Apr 30, 1974
Accession Number
AD0919780

Entities

People

  • John W. Barnes Jr

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Deficiencies
  • Engineering
  • Engineers
  • Human Factors Engineering
  • Inspection
  • Interdisciplinary Science
  • Maintenance
  • Systems Engineering
  • Systems Science
  • Test And Evaluation
  • Training
  • Value Engineering

Readers

  • Aerospace Test and Evaluation
  • Climatology