Joint High Speed Vessel (JHSV) Follow on Operational Test and Evaluation (FOT and E) Report

Abstract

This document reports on the Follow-on Operational Test and Evaluation (FOT and E) of the Joint High Speed Vessel (JHSV) ship class. The events covered in this testing were not performed during the Initial Operational Test and Evaluation (IOT and E) because of the unavailability of test assets, primarily the Mobile Landing Platform with the Core Capability Set(MLP (CCS)). 1 Testers collected effectiveness data from three FOT and E events on USNS Millinocket (JHSV 3), and suitability data derived from the maiden voyage maintenance records of USNS Spearhead (JHSV 1).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 21, 2015
Accession Number
AD1002351

Entities

People

  • J. M. Gilmore

Organizations

  • Office of the Secretary of Defense

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Boats
  • Connecting Rods
  • Control Surfaces
  • Control Systems
  • Engines
  • Failure Mode And Effect Analysis
  • Maintenance
  • Marine Corps
  • Oceans
  • Second World War
  • Ships
  • Special Forces
  • Special Operations Forces
  • Surfaces
  • Test And Evaluation
  • Transport Ships
  • Warfare

Readers

  • Aerospace Test and Evaluation
  • Maritime Combat Support and Expeditionary Logistics.
  • Neurodegenerative Parkinson's Disease and Rickettsial Disease handbook, including the data level of dopamine, BC, neurons, and PD.

Technology Areas

  • 5G