Final Environmental Assessment for Implementation of Proposed Actions in the Moody Air Force Base Integrated Natural Resources Management Plan (INRMP)
Abstract
The U.S. Air Force (USAF) has recently updated the Integrated Natural Resources Management Plan (INRMP) for Moody Air Force Base (AFB). The INRMP was prepared to assist the installation commander with the conservation and rehabilitation of natural resources consistent with the military mission of Moody AFB for the next 4 years (Fiscal Year [FY] 2015-2018). The INRMP is consistent with the Sikes Act Improvement Act of 1997, as amended through 2010 (16 United States Code [U.S.C.] 670a et seq.), which requires the preparation, implementation, update, and review of an INRMP for each military installation in the United States and its territories with significant natural resources. This Environmental Assessment (EA) will evaluate the potential environmental impacts associated with implementing activities outlined in the INRMP and the No Action Alternative.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 2015
- Accession Number
- AD1008869
Entities
Organizations
- Air Force Civil Engineer Center