Sediment Budget Analysis; Masonboro Inlet, North Carolina

Abstract

A sediment budget analysis was performed for the vicinity of Masonboro Inlet and adjacent beaches, by the U.S. Army Engineer District, Wilmington, for understanding response of the inlet complex and associated beaches to dredging of Masonboro Inlet and to dredged material placement operations along the beaches of Masonboro Island (south side of inlet) and Wrightsville Beach (north side of inlet). The analysis provides valuable information to assess the most effective beneficial use of dredged material from the Masonboro Inlet complex. The analysis of longshore sediment transport calculations showed a net transport towards Masonboro Inlet from both sides of the inlet. The calculated transport rate from Masonboro Island onto the offshore ebb shoal of the inlet complex was 78,530 cubic yards per year (cy/yr) while the transport rate from Wrightsville Beach into the inlet and offshore ebb shoal of the inlet complex was 147,232 cy/yr.The sediment transport calculated at the western end of Masonboro Island near Carolina Beach Inlet was 361,493 cy/yr to the west, within 2 of the previously estimated rate of 354,000 cy/yr (USACE 2000) for the area. The sediment transport rate calculated on the eastern end of Wrightsville Beach was 43,427 cy/yr toward the east.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 15, 2017
Accession Number
AD1038027

Entities

People

  • Kevin B. Conner
  • Linda S. Lillycrop

Organizations

  • Engineer Research and Development Center

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Coordinate Systems
  • Dredging
  • Ecology
  • Engineering
  • Engineers
  • Grids
  • Materials
  • Navigation
  • North Carolina
  • Offshore
  • Regions
  • Sedimentation
  • Shores
  • United States
  • Water
  • Waterways

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering