State Route 58 Kramer Junction Expressway Replacement of Electrical Utility Poles

Abstract

Under the larger SR-58 Expressway Project, Caltrans proposes to realign and widen a 13.3-mile segment of State Route 58 (SR-58) from 0.4 mile west of the Kern County/San Bernardino County line at Post Mile (PM) R143.5 to a point that is approximately 7.5 miles (PM R12.9) east of United States Route 395 (US-395). The SR-58 Expressway Project would widen the existing SR-58 from a two-lane conventional highway to a four-lane expressway and construct a railroad grade separation interchange at the SR-58/US-395 Junction. The SR-58 Expressway Project is included in the Southern California Association of Governments (SCAG) 2015 Federal Transportation Improvement Program (FTIP) as Project 34770, which was adopted by SCAG on September 30, 2014 and found to be conforming by the Federal Highway Administration (FHWA) in December 2014. This project is also included in the SCAG 20162040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), which was found conforming by FHWA and the Federal Transit Administration (FTA) on June 1, 2016.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 2017
Accession Number
AD1038985

Entities

Organizations

  • California Department of Transportation

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Animal Structures
  • Birds
  • Construction
  • Environment
  • Environmental Health
  • Environmental Protection
  • Habitats
  • Health Services
  • Medical Personnel
  • United States
  • Water Resources
  • Wildlife

Readers

  • Asian Economic Studies
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Riverine Ecology