State Route 58 Kramer Junction Expressway Replacement of Electrical Utility Poles
Abstract
Under the larger SR-58 Expressway Project, Caltrans proposes to realign and widen a 13.3-mile segment of State Route 58 (SR-58) from 0.4 mile west of the Kern County/San Bernardino County line at Post Mile (PM) R143.5 to a point that is approximately 7.5 miles (PM R12.9) east of United States Route 395 (US-395). The SR-58 Expressway Project would widen the existing SR-58 from a two-lane conventional highway to a four-lane expressway and construct a railroad grade separation interchange at the SR-58/US-395 Junction. The SR-58 Expressway Project is included in the Southern California Association of Governments (SCAG) 2015 Federal Transportation Improvement Program (FTIP) as Project 34770, which was adopted by SCAG on September 30, 2014 and found to be conforming by the Federal Highway Administration (FHWA) in December 2014. This project is also included in the SCAG 20162040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), which was found conforming by FHWA and the Federal Transit Administration (FTA) on June 1, 2016.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 2017
- Accession Number
- AD1038985
Entities
Organizations
- California Department of Transportation