Portsmouth Naval Shipyard Microgrid and Ancillary Services - Kittery, ME
Abstract
The technical objective of this project is to demonstrate that the emerging technologies of Fast Load Shed (FLS)-capable microgrid controls and Battery Energy Storage Systems (BESSs) can be integrated with onsite generation at military bases to enhance the security and reliability of electric service to the base, provide valuable ancillary services to the electric grid Independent System Operator (ISO), and generate cost savings for the Government.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 30, 2017
- Accession Number
- AD1048778
Entities
People
- Anthony Colonnese
- Troy Wilsey