Engineering Criteria For Cost Effective Construction Inspection Of Naval Shore Facilities
Abstract
This report describes the construction quality control system that was being followed during most of the period covered by the study effort, discusses some problems observed in the functioning of that system, and then lists several conceivable alternatives to it. Some ideas for future development, which recognize the current modifications provided for by the innovation entitled Contractor Quality Control (CQC), are presented.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1973
- Accession Number
- AD1079976
Entities
People
- R. E. Bergman
Organizations
- Naval Facilities Engineering Service Center