Integrated Scheduling and Control for Real Time Optimization of Factory Operations
Abstract
The project will address gaps directly by integrating production scheduling with lower level process control and automation decisions.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 30, 2018
- Accession Number
- AD1089117
Entities
People
- John M. Wassick