Impact Load Tests, Structural Analyses And Load Limitations of The Marginal Wharf
Abstract
In response to Work Order N6843897PO9001 from the Trident Refit Facility (TRIREFFAC) the Naval Facilities Engineering Service Center (NFESC) conducted impact load tests on the Marginal Wharf at SUBASE Bangor. NFESC has also conducted finite element analyses of the pier to determine if five TRIREFFAC cranes can safely conduct lift operations. These cranes are the Lorain LRT 300D. Grove RT 655, P and H CN 150, Grove RT 880, and Grove TM 890.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1998
- Accession Number
- AD1092239
Entities
People
- G. Warren