User Workflow Manager
Abstract
The overall objective of the project is to recommend, then validate, an end-to-end proof of concept solution for a general, domain agnostic approach towards workflow systems. Phase I entailed a set of ostensibly viable candidate solutions mapped against the requirements, which RedLine then derived a final recommendation based on sliding-scale evaluation criteria. Phase II objective (prototype testing) validated FireWorks against the trade study requirements and evaluation criteria in the MHPCC technical environment. Software discussed in the document is still a prototype system, and specific recommendations are offered to bring FireWorks into operations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 22, 2019
- Accession Number
- AD1116620
Entities
People
- Mark Potts
- Terrence Mcguinness