Afghan Air Force: DOD Met the Initial Date for Fielding UH-60 Helicopters, but the Program is at Risk of Not Having Enough Trained Pilots or the Capability to Maintain Future UH-60s
Abstract
The objectives of this audit were to assess the extent to which DOD (1) met its planned initial operational capability date of June 2018; (2) developed a training program to ensure that the AAF and the SMW will make full use of the UH-60s; and (3) identified and addressed maintenance challenges.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 2019
- Accession Number
- AD1137709
Entities
People
- John F. Spoko
Organizations
- Special Inspector General for Afghanistan Reconstruction