Gorimar Industrial Park: Lack of Electricity and Water Have Left This $7.7 Million U.S.-funded Industrial Park Underutilized by Afghan Businesses
Abstract
This report discusses the results of SIGARs inspection of the infrastructure and supporting facilities at Gorimar Industrial Park in Balkh province. The report recommends that the U.S. Agency for International Development (USAID) (1) determine the current status of the Afghan Investment Support Agencys (AISA) effort to connect Gorimar Industrial Park to the local power grid, and, if necessary, identify appropriate steps to help complete the project, (2) determine, in consultation with AISA, the feasibility of establishing the parks generators as a backup source of electrical power, and (3) determine why contract files for Gorimar Industrial Park were missing and ensure that contract files for all future projects contain critical project design, planning, construction, quality assurance, and related documents required by Federal Acquisition Regulation Subpart 4.8, Government Contract Files.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 2015
- Accession Number
- AD1140146
Entities
People
- John Sopko
Organizations
- Special Inspector General for Afghanistan Reconstruction