U.S. Army Corps of Engineers (USACE) Status Update on SIGAR Inspection Report 13-1, Kunduz ANA Garrison: Army Corps of Engineers Released DynCorp of All Contractual Obligations Despite Poor Performance and Structural Failures
Abstract
The purpose of this correspondence is to provide a status update on actions taken by USACE related to recommendations 1 and 3 in SIGAR Inspection Report 13-1. In response to recommendation 1, an updated listing and discussion of associated costs of the corrections performed at the Kunduz ANA Garrison is provided at Enclosure 1. Recommendation 3 requested that USACE "Explain in writing, either in response to this draft report or in separate correspondence, why the settlement was determined to be fair and reasonable." As mentioned in our previous response, USACE established a multidisciplinary team to conduct a more thorough investigation. A summary of the team's findings is provided at Enclosure 2.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 25, 2013
- Accession Number
- AD1141068
Entities
People
- John S. Hurley
Organizations
- United States Army