Kunduz Afghan National Police Provincial Headquarters: After Construction Delays and Cost Increases, Concerns Remain about the Facility's Usability and Sustainability

Abstract

In August 2010, the U.S. Army Corps of Engineers - Afghanistan Engineer District - North (USACETAN) awarded a $12.4 million contract task order to ECCI-CMETAG Joint Venture to design and build facilities at the Afghan National Police (ANP) Provincial Headquarters in Kunduz province. Subsequent modifications to the contract increased its total value to$17.7 million. On November 15,2012, the Special Inspector General for Afghanistan Reconstruction (SIGAR)conducted a site inspection at the facility to determine whether construction was being completed in accordance with contract requirements inapplicable construction standard.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 24, 2013
Accession Number
AD1141070

Entities

Organizations

  • Special Inspector General for Afghanistan Reconstruction

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Afghanistan
  • Army
  • Army Corps Of Engineers
  • Complex Systems
  • Construction
  • Contract Administration
  • Contractors
  • Contracts
  • Design Criteria
  • Electrical Equipment
  • Electrical Grids
  • Engineers
  • Force Protection
  • Fuels
  • Maintenance
  • Materials
  • Nato
  • Protective Equipment
  • Quality Control
  • Security
  • Specifications
  • Standards
  • Stations
  • Water Tanks

Readers

  • Facility/Structural Engineering.
  • Military and Counterinsurgency Studies.