Report of Test on Siren, Meter-Operated, Submitted by Federal Electric Company

Abstract

The siren as received from the manufacturer was first tested for its shock integrity, required by the specifications, reference (b), subparagraph F-3h. Following, it was set up in a standard test circuit and carefully observed while under test for the required 48-hour endurance run, operated at intervals of every alternate minute, at its rated voltage. During this test, the temperature rise of the motor at ambient temperature of 65 deg C was measured, using the resistance method. All remaining tests were made, in order, as outlined under the specifications, reference (b). The test was concluded with an inspection of the materials, design and workmanship.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 30, 1936
Accession Number
AD1150882

Entities

People

  • J. S. Bryant
  • W. B. Roberts

Organizations

  • United States Naval Research Laboratory

Tags

DTIC Thesaurus Topics

  • Inspection
  • Intervals
  • Materials
  • Specifications
  • Standards

Readers

  • Fault Tolerant Diagnosis of Black and White Balloon Isolation Tests Using ¥.
  • Thermal Physics or Thermal Science.