Report of Test of Transformer Gun Firing - 100 Volt-Amperes Submitted by Central Instrument Company
Abstract
The subject transformer was set up at this Laboratory in standard test circuits where its performance was carefully checked to ascertain whether it was in strict accordance with the specifications. An inspection of the sample transformer, relative to approved materials, design, workmanship and shock integrity, concluded the test.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 16, 1939
- Accession Number
- AD1157747
Entities
People
- J. S. Bryant
- W. B. Roberts
Organizations
- United States Naval Research Laboratory